Development of the Benkala and South Benkala fields
Operator/initiator:
Aktobe Copper Company
Stage:
Geological exploration is underway to put the reserves of deposits
on the state balance sheet
Dates:
Until 2026
Investment amount:
36.5 billion tenge
Location:
Aytekebi District, Aktobe Region, Kazakhstan
Benkala and South Benkala deposits containing copper, as well as gold and molybdenum, will be developed in the Aitekebi Region. The project is estimated at 36.5 billion tenge. Capacity – 10 thousand tons of ore per year.
Industrial development of the Shalkiya polymetallic ore deposit
Operator/initiator:
ShalkiyaZinc LTD
Stage:
Construction and installation activities are ongoing
Dates:
2022–2025
Investment amount:
235 bn tenge
Location:
Kyzylorda region
The reserves are 104 mil tonnes of lead-zinc ore (3.4 mil tonnes of zinc metal in ore, 0.9 mil tonnes of lead metal in ore).
Modernisation of production at the Aksu mine
Operator/initiator:
MMC Kazakhaltyn
Stage:
Preparation of documentation
Dates:
2022–2025
Investment amount:
11, 6 bn tenge
Location:
Akmola region
Construction of a mining and processing plant and industrial development of the Aidarly copper deposit
Operator/initiator:
LLP Aidarly Project (Aidarly Project)
Stage:
Preparation of documentation
Dates:
2019–2026
Investment amount:
560.5 bn tenge
Location:
East Kazakhstan region
Construction of a mining and processing plant at the Kyzyl Kain ore site
Operator/initiator:
LLP East Smetling
Stage:
Preparation of documentation
Dates:
2021–2024
Investment amount:
216,6 bn tenge
Location:
Tarbagatay region, East Kazakhstan region
Capacity – 25 mil tonnes of ore per year
Construction of a concentration mill at the Kacharsky quarry
Operator/initiator:
Sokolovsko-Sarbayskoye Mining and Processing Production
Association (SSGPO JSC) (ERG)
Stage:
Preparation of documentation
Dates:
2022 – 2030
Investment amount:
350 bn tenge
Location:
Kostanay region